In the face of the sudden rainstorm, what should the concrete mixing equipment do? How can we minimize losses in the face of severe weather? Below are several methods organized by the mixing plant, hoping to be helpful to you.
1 . Prevention work should be in place. Pay attention to the weather forecast in advance, understand the weather, prepare well, ensure mutual cooperation and coordination, and ensure that all work is carried out in an orderly manner.
2. The dispatcher shall timely communicate with the site about the rainstorm and negotiate with the site to do a good job of on-site treatment, and inspect whether the color steel tiles of the silo and hopper are in good condition to ensure that there is no water leakage and rain.
3. Quality inspectors should closely monitor the slump, workability, and other conditions of each batch of concrete being discharged from the machine. After waiting in line for the concrete tanker truck to receive the ash at the discharge port, the water should be drained again before receiving the ash. Inspection personnel should check that the hopper of the transport vehicle has been pre installed with rainproof cloth.
4. The mixing driver should pay attention to observing on the monitor whether there is any leakage of rainwater from the ground silo, the changes in the sand and gravel materials on the inclined belt during the feeding process, and the changes in the slump of the concrete discharged from the machine.
5. The safety officer shall promptly inspect whether the lightning protection equipment of the concrete mixing plant is intact.
6. The station master shall inspect the entire concrete mixing plant in a timely manner and check the operation of the machinery, taking responsibility and sticking to their work posts.
7. The overall dispatcher shall coordinate with the on-site personnel in a timely manner regarding the internal and external conditions of the concrete mixing plant.
In this situation, in addition to preventive work, on-site scheduling and follow-up work should also be fully prepared. It is difficult to carry out the mixing operation at the construction site in rainstorm. I hope these suggestions can play a role in minimizing the risk of rainstorm.